Electrification welfare: an exact equilibrium benchmark with financing
Status: Unresolved. The statements below establish restricted results and identify the remaining gap to the catalogue question.Question and scope
The target is the inclusive money-metric gain from an electrification policy after prices, wages, ownership and financing adjust. We solve a competitive two-good economy in which electricity raises one sector's productivity and project costs use real resources. The result supplies an exact comparison with summing direct production gains. It does not identify access, reliability and affordability effects from actual connection trials.A closed economy and fixed households
A fixed household population has labor endowments $L_i>0$, with total $L$, and identical Cobb--Douglas preferences $u_i(x_i,y_i)=x_i^\theta y_i^{1-\theta}$, $0<\theta<1$. Labor is perfectly mobile between two competitive constant-returns sectors: \[ X=A_z L_X,\qquad Y=B L_Y,\qquad L_X+L_Y=L, \] where $B>0$. Policy $z$ changes electrical-sector productivity $A_z>0$ and consumes $C_z\geq0$ units of good $Y$ in construction, operation and any included damage-equivalent resource use. Take $Y$ as numeraire. The government levies lump-sum taxes $t_iC_z$, with $t_i\geq0$, $\sum_i t_i=1$. Assume $BL_i-t_iC_z>0$ for all compared policies. There are no pure profits under constant returns; the fixed households receive all labor income. Welfare weights $\omega_i\geq0$ are fixed before the policy.Equivalent variation is measured using baseline prices: it is the income change at those prices that reproduces the new utility. This convention is declared because using post-policy prices would give a different money measure.
For income $I$ and relative price $p$, indirect utility is $\theta^\theta(1-\theta)^{1-\theta}I p^{-\theta}$. Therefore the baseline-price expenditure needed to reach the new utility is $I_{i,z}(p_0/p_z)^\theta$. Subtract baseline income to obtain each household's equivalent variation, and sum with the stated weights to prove (1). Unit weights and the tax shares summing to one give (2). Subtracting $C_z-C_0$ again would count an already financed resource cost twice. ∎
All households receive the consumption-price benefit, including households with no direct electrical-sector connection. Distributional weights also make the incidence of financing relevant even though the project has one aggregate resource cost.
Direct output gains can overstate the money-metric gain
Assume $C_0=C_z=0$ and set $A_z/A_0=1+g$, $g\geq0$. Holding baseline sectoral labor fixed, the extra electrical-sector output valued at its baseline price is $\theta BLg$.A transparent restricted identified set
Suppose $BL$ is known, $C_0=0$, and independent information restricts $r\in[r_-,r_+]$ with $1\leq r_-\leq r_+$, $\theta\in[\theta_-,\theta_+]\subset(0,1)$ and $C_z\in[C_-,C_+]\subset[0,BL)$. The observation rule is that every combination in this parameter rectangle remains admissible; richer expenditure data may rule this out.Completion Estimate
34%This is a post hoc, heuristic estimate for the full catalogue target. The attempt solves inclusive baseline-price equivalent variation in a two-good electrification economy, proves errors from aggregating direct gains, and gives sharp restricted parameter bounds. It does not identify actual connection, reliability, and tariff effects with migration, entry, rationing, heterogeneous preferences, and experimental-to-equilibrium transport.
Remaining gap and references
The benchmark fixes technologies outside the electrical sector, labor supply, ownership and the welfare convention. It omits migration, entry, outages, network rationing and heterogeneous preferences. An actual intervention must map connections, reliability and tariffs to productive capability and resource costs, and must justify transport from experimental firms to this equilibrium. None of those mappings is estimated here.Robyn Meeks and Meera Mahadevan (2025), Electricity Infrastructure, VoxDevLit 15(1), May 2025. https://voxdev.org/voxdevlit/electricity-infrastructure. The review motivates the general-equilibrium agenda; the two-good model and its welfare formula are separately specified in this attempt.